User manual TOSHIBA RAS-13YK-E SERVICE MANUAL

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual TOSHIBA RAS-13YK-E. We hope that this TOSHIBA RAS-13YK-E user guide will be useful to you.


TOSHIBA RAS-13YK-E SERVICE MANUAL: Download the complete user guide (1478 Ko)

Manual abstract: user guide TOSHIBA RAS-13YK-ESERVICE MANUAL

Detailed instructions for use are in the User's Guide.

[. . . ] DAS-SM-00-002 SUPPLEMENT SERVICE MANUAL AIR-CONDITIONER SPLIT WALL TYPE RAS-13YKX / RAS-13YAX RAS-13YK-E / RAS-13YA-E RAS-13YK-ES / RAS-13YA-ES RAS-13YK-HX / RAS-13YA-HX RAS-13YKX-T / RAS-13YAX-T RAS-13YKX-T2 / RAS-13YAX-T2 CONTENTS 1. SPECIFICATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CONSTRUCTION VIEWS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . WIRING DIAGRAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . [. . . ] · A place where high-frequency waves are likely to be generated as from radio equipment, welders, and medical equipment. <Flaring> (1) Cut the pipe with a pipe cutter. 90° Obliquity Roughness Warp Fig. 8-5-2 (2) Insert a flare nut into the pipe, and flare the pipe. 8-5-1. Required Tools for Installation Work 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) Philips screw driver Hole core drill (65mm) Gaugramanifold Spanner Pipe cutter Knife Reamer Gas leak detector Tape measure Thermometer Mega-tester Electro circuit tester Vacuum pump Hexagonal wrench (5mm) Torque wrench Outer dia. 6, 35mm 9, 52mm 12, 7mm A (mm) R22 Imperial 1, 0 ~ 1, 5 Rigid 0, 5 ~ 1, 0 A (mm) R401A Imperial 1, 5 ~ 2, 0 1, 5 ~ 2, 0 Rigid 1, 0 ~ 1, 5 1, 0 ~ 1, 5 1, 5 ~ 2, 0 0, 5 ~ 1, 1 A Die Pipe Fig. 8-5-3 <Tightening connection> Align the centers of the connecting pipes and tighten the flare nut as far as possible with your fingers. Then tighten the nut with a spanner and torque wrench as shown in the figure. CAUTION · Do not apply excess torque. Otherwise, the nut may crack depending on the installation conditions. Tightening touque N·m (kgf·m) 16 ~ 18 (1, 6 ~ 1, 8) 30 ~ 42 (3, 0 ~ 4, 2) 50 ~ 62 (5, 0 ~ 6, 2) Flare nut Outer dia. 6, 35mm 9, 52mm 12, 7mm Half union or packed valve Externally threaded side Use a wrench to secure. Internally threaded side Use a torque wrench to tighten. Fig. Vacuum Pumping Pressure gage INFORMATION In order to prevent any other refrigerant from being charged accidentally, each port of the manifold has been changed in shape. Differences in Port Size between Conventional R22 and R410A Manifold for R22 Port size 7/16 UNF 20 threads per inch Manifold for R410A 1/2 UNF 20 threads per inch Manifold valve High pressure side handle Low pressure side handle Charge hose (A) Outdoor unit Indoor unit Gas (Ø9, 52) C A Service port Charge hose (B) Lo Hi VP B Liquid (Ø6, 35) Packed valve D AIR PURGE Evacuate the air in the connecting pipes and in the indoor unit using vacuum pump. <Use of vacuum pump> (1) Connect the charge hose (A) from the manifold valve to the charge inlet of the gas side packed valve. (5) Close the low pressure side handle of manifold valve after vacuumizing and stop the vacuum pump. Continue vacuumizing more than 15 minutes and check the pressure gage indicates ­0, 1MPa (­76 cmHg). (7) Securely tighten the stem cap to each of the packed valve stems. Fig. 8-5-5 CAUTION · KEEP IMPORTANT 4 POINTS FOR INSTALLATION (PIPING WORK) (1) Take away dust and moisture (Inside of the connecting pipes. ) (2) Tight connection (between pipes and unit) (3) Evacuate the air in the connecting pipes using VACUUM PUMP . (4) Check gas leak (connected points) <Packed Valve Handling Precautions> · Open the valve stem all the way out; so not try to open it beyond the stopper. · Valve stem cap tightening torque is as follows; Gas pipes side (Ø9, 52) : 30 ~ 42 N·m (3, 0 ~ 4, 2 kgf·m) Liquid pipe side (Ø6, 35) : 16 ~ 18 N·m (1, 6 ~ 1, 8 kgf·m) Service port cap : 9 ~ 10 N·m (0, 9 ~ 1, 0 kgf·m) <A5 mm hexagon wrench is required. > Flare nut Valve body Stopper Wrench Service port Valve stem Service port cap Valve stem cap Note : Service port at Gas pipes valve only. Wiring Connection (1) Remove the electric parts cover from the outdoor unit. (1 screw) (2) Connect the connecting cable to the terminals as identified with their respective matched numbers on the terminal block of indoor and outdoor units. (Strip the sheath of connecting cable with following stripping length to and insert into the terminal block. ) (3) When connect the connecting cable to outdoor unit terminal, make a loop as shown in the installation diagram of indoor and outdoor unit, to prevent water coming in the outdoor unit. (4) Insulate the unused cords (conductors) with water coming in the outdoor unit. Gas Leak Test Flare nut connections (indoor unit) C D Electric parts cover Valve stem cap connection A B Service port Valve stem cap connection Flare nut connections (Outdoor unit) Fig. [. . . ] For compressor For fan motor S Capacitor for fan motor 1) Perform the process Q above. (1- ST2T Ø4 x 8 l) 3) Remove the cable connected to the terminal. T Overload relay 1) Perform the process Q above. 4) Remove Fustons of leads. Over lord relay ­ 50 ­ 11. Indoor Unit (1) RAS-13YK-E, RAS-13YK-ES 405 404 402 406 413 403 412 402 Location No. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE TOSHIBA RAS-13YK-E




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual TOSHIBA RAS-13YK-E will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.