User manual TJERNLUND SS1R SIDESHOT WITH UC1 UNIVERSAL CONTROL (VERSION X.06) 8504117 REV B 0206

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual TJERNLUND SS1R SIDESHOT WITH UC1 UNIVERSAL CONTROL (VERSION X.06) 8504117 REV B 0206. We hope that this TJERNLUND SS1R SIDESHOT WITH UC1 UNIVERSAL CONTROL (VERSION X.06) 8504117 REV B 0206 user guide will be useful to you.


TJERNLUND SS1R SIDESHOT WITH UC1 UNIVERSAL CONTROL (VERSION X.06) 8504117 REV B 0206 : Download the complete user guide (1323 Ko)

Manual abstract: user guide TJERNLUND SS1R SIDESHOT WITH UC1 UNIVERSAL CONTROL (VERSION X.06) 8504117 REV B 0206

Detailed instructions for use are in the User's Guide.

[. . . ] B 02/06 TJERNLUND PRODUCTS, INC. 1601 Ninth Street · White Bear Lake, MN 55110-6794 PHONE (800) 255-4208 · (651) 426-2993 · FAX (651) 426-9547 Visit our web site · www. tjernlund. com UC1 VERSION X. 06 THIS VENT SYSTEM HAS BEEN LISTED FOR USE WITH SPECIFIED RHEEM, RUUD, WEATHERKING AND HEAT CONTROLLER OIL FURNACES BY UL AND ULC. SEE FURNACE RATING PLATE FOR VERIFICATION. INCLUDES UC1 UNIVERSAL CONTROL MODEL SS1R INSTALLATION INSTRUCTIONS !Recognize this symbol as an indication of important Safety Information! OWNER INSTRUCTIONS, DO NOT DESTROY NOTE: FLUE GAS TEMPERATURES MUST NOT EXCEED 575oF AT VENT SYSTEM INLET. THESE INSTRUCTIONS ARE INTENDED AS AN AID TO QUALIFIED, LICENSED SERVICE PERSONNEL FOR PROPER INSTALLATION, ADJUSTMENT AND OPERATION OF THIS UNIT. READ THESE INSTRUCTIONS THOROUGHLY BEFORE ATTEMPTING INSTALLATION OR OPERATION. [. . . ] A ground wire will need to be installed between the system ground and the grounding lug in SS1R electrical box. A neutral wire will need to be installed from the oil furnace line neutral to the terminal labeled "2" on the UC1 control board. Note: The existing wire nut (which connects all the line neutrals together) is full and a new wire cannot be added to it. A new (larger) wire-nut will have to be installed and this will require that the neutral wire is cut and stripped. Route a wire to connect the orange lead on the primary furnace control to the UC1 control board terminal labeled "1". Last, route a wire between the Beckett burner motor and ignition transformer to the UC1 control board terminal labeled "M". The RED Voltage Jumper on UC1 board in SS1R must be in the 115V position. FIELD WIRING TO RHEEM, RUUD, OR WEATHERKING -OBD-XXX & OPD-XXX MODEL OIL BURNING FURNACES C. G. DIAGRAM Q ORANGE PRIMARY CONTROL BLACK WHITE VIA JUNCTION BOX TO FACTORY-WIRED LIMIT SWITCHES 115V IMPORTANT: RED JUMPER POSITION MUST BE THE SAME AS APPLIANCE INTERLOCK VOLTAGE. DRY 24V CALL JUMPER J2 UNIVERSAL CONTROL C Y F F R W G J1 OIL VALVE SUPPLY 115 VAC 50/60 Hz GROUND N XL XN TO FUSE DISCONNECT NEUTRAL YELLOW YELLOW GROUNDED JUNCTION BOX M MTR VENTER MOTOR (FACTORY-WIRED) IMPORTANT: CRIMP GROUND WIRE TO GROUNDING SPADE TERMINAL IN ELECTRICAL BOX. BLACK TO BURNER MOTOR TO FLAME SENSOR BECKET BURNER TO IGNITION TRANSFMR B/W LEGEND: 115 VAC, FIELD-WIRED 115 VAC, FACTORY-WIRED LOW VOLTAGE D/N 9183047-5 12 6. For "F" (-OBF-XXX, -OPF-XXX and etc. ) series oil furnaces: Remove a knock-out slug from the existing junction box mounted to the burner (see Diagram R). A 7/8" diameter bushing or strain-relief must be installed in the hole formed by removing the slug. In addition to L1, Neutral and ground that must be supplied to the SS1R UC1 control board, five wires are to be installed from the oil furnace to the SS1R Side Wall Vent System. Attach L1 (115V) and Neutral wires from a nominal 115VAC power source to L & N on the SS1R UC1 control board. This power should be routed through a disconnect so that power to the SS1R can be turned off remotely if necessary. Additionally, all wire should be run through the appropriate conduit per NEC standards as noted in step 1. A ground wire will need to be supplied between the system ground and the grounding lug in the SS1R electrical box. A neutral wire will need to be installed from the oil furnace line neutral to the terminal labeled "2" on the UC1 control board. Inside the burner mounted junction box, remove the leads from the primary control terminals labeled "Burner/Motor" and "Valve". Install a field-constructed wire between the lead removed from the terminal labeled "Burner/Motor" (step E above) and the UC1 control board terminal labeled "M". The connection to the burner motor lead will require a special male ¼" quick connect (Amp Manufacturing part # 2-520102-2 (insulated male spade)). Also, the wire connection to the "Burner/Motor" lead should be made inside the burner junction box and should be covered and concealed by the primary control once it is replaced. [. . . ] This warranty DOES NOT cover the complete SS1R if it is operative, except for the defective part. will issue credit or provide a free part to replace one that becomes defective during the two year warranty period. Proof of date of the installation in the form of the contractor sales/installation receipt is necessary to prove the unit has been in service for under two years. All receipts should include the date code of the SS1R to ensure that the defective component corresponds with the complete unit. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE TJERNLUND SS1R SIDESHOT WITH UC1 UNIVERSAL CONTROL (VERSION X.06) 8504117 REV B 0206




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual TJERNLUND SS1R SIDESHOT WITH UC1 UNIVERSAL CONTROL (VERSION X.06) 8504117 REV B 0206 will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.