User manual SUB-ZERO 700 INSTALL GUIDE

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual SUB-ZERO 700 INSTALL GUIDE. We hope that this SUB-ZERO 700 INSTALL GUIDE user guide will be useful to you.


SUB-ZERO 700 INSTALL GUIDE : Download the complete user guide (470 Ko)

Manual abstract: user guide SUB-ZERO 700 INSTALL GUIDE

Detailed instructions for use are in the User's Guide.

[. . . ] I N T E G R AT E D R E F R I G E R AT I O N INSTALLATION INSTRUCTIONS CONTENTS Installation Recommendations Installation Specifications Installation Instructions Installation Checklist Service Information 3 4 7 18 19 Features and specifications indicated herein and on the website are subject to change at any time without notice. Check our website, subzero. com, for the most up-to-date specifications. As you follow these instructions, you will notice WARNING and CAUTION symbols. This blocked information is important for the safe and efficient installation of Sub-Zero equipment. There are two types of potential hazards that may occur during installation. signals a situation where minor injury or product damage may occur if you do not follow instructions. states a hazard that may cause serious injury or death if precautions are not followed. Another footnote we would like to identify is IMPORTANT NOTE: This highlights information that is especially relevant to a problemfree installation. SUB-ZERO ® is a registered trademark of Sub-Zero Freezer Company, Inc. I N T E G R AT E D I N S TA L L A T I O N R E C O M M E N D A T I O N S I N S TA L L AT I O N R E C O M M E N D AT I O N S The importance of the installation of the Sub-Zero Integrated unit cannot be overemphasized. [. . . ] Plug the power supply cord into the 15 amp grounded electrical outlet. With power applied to the appliance, check for lighting and cooling before going any further. Refer to illustration 4 below for the location of the UNIT ON/OFF key pad for base units and illustration 5 for tall units. Once you are satisfied that the unit is operating properly, shut off power to the electrical outlet at the circuit breaker and proceed. FRE EZER COLDE R WARM ER COLDE R WARM ER REF RIGERA TOR ICE ON/O FF ON/O FF UN ON/O IT FF Unit On/Off Unit On/Off Illus. 5 Dimensions in parentheses are in millimeters unless otherwise specified. 11 I N T E G R AT E D I N S TA L L A T I O N I N S T R U C T I O N S LEVEL T H E U N I T M O L D I N G I N S TA L L AT I O N Level the Integrated unit by turning the front leveling legs clockwise to raise the unit, or counterclockwise to lower it. To assist you in adjusting the front leveling legs up or down, use a standard screwdriver blade and place it in the front leveling leg as shown in illustration 6 below. The rear leveling legs are adjusted from the front of the base by turning the Phillips head screw. IMPORTANT NOTE: The rear leveling legs will only move 1/16" (2) for every 18 revolutions on the Phillips head screw. Once the unit is leveled, secure the unit in place by using the side mounting clips and #8 x 1/2" screws provided. The decorative white molding strips for the side and top of the unit can be snapped into place. The top molding strip used on Integrated tall units, must be installed before the side molding can be attached. The top molding strip is held in place by double-sided velcro fasteners. For installations where units are side by side, refer to Dual Installations on page 17. NOTE: The molding strips may be painted to match the surrounding cabinetry, if you choose. Follow these easy steps: Rough up the surface to be painted with fine grit sandpaper. Use an appliance or industrial grade, oil base, high gloss enamel paint. To reduce the possibility of the unit tipping forward, the front leveling legs must be in contact with the floor. Top Molding Illus. 9 12 I N T E G R AT E D I N S TA L L A T I O N I N S T R U C T I O N S WAT E R L I N E C O N N E C T I O N Q U I C K C O N N E C T WAT E R VA LV E For units with an ice maker, the quick connect water valve and PEX tubing are located on the right-hand side of the unit towards the bottom. Pull the coiled gray PEX tubing with a red cap and captured metal nut toward the house water supply line. Remove and discard the red cap, then attach the tubing to the union with captured nut. Refer to illustration 10 below. In areas with water of high mineral content, the use of an in-line water filter is recommended. Make sure the filter is positioned and accessible for replacement when necessary. Let your customer know that the first container filled with ice should be discarded, as with any new connection there may be impurities in the ice from the water supply line. Shut power off at the circuit breaker before making electrical connection to the solenoid, if required. IMPORTANT NOTE: Turn on the water supply and check all fittings for leaks. Make certain the electrical harness is attached to the solenoid. PEX Tubing Illus. [. . . ] Refer to illustration 3 on page 10. When two Integrated units are installed closer than 2" (51) to one another, it is necessary to use the Sub-Zero dual installation heater kit (BBDUAL or TTDUAL). The heater plate from this kit must be attached to the left side exterior of the right hand unit before the units are slid into position. Contact your Sub-Zero dealer for the proper components and installation instructions. For questions relative to the installation, call Sub-Zero at 800-222-7820. OPTIONAL COMPONENTS Optional installation components are available through your Sub-Zero dealer. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE SUB-ZERO 700 INSTALL GUIDE




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual SUB-ZERO 700 INSTALL GUIDE will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.