If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual SHRINK POLYMER SYSTEMS HEATSHRINK TERMINATION FOR 3 CORE PILC BELTED CABLES 12KV. We hope that this SHRINK POLYMER SYSTEMS HEATSHRINK TERMINATION FOR 3 CORE PILC BELTED CABLES 12KV user guide will be useful to you.
Manual abstract: user guide SHRINK POLYMER SYSTEMS HEATSHRINK TERMINATION FOR 3 CORE PILC BELTED CABLES 12KV
Detailed instructions for use are in the User's Guide.
[. . . ] Installation Instruction Heatshrink Termination For 3 Core Pilc Belted Cables 12kV !!
PLEASE READ INSTRUCTIONS THOROUGHLY BEFORE PROCEEDING INSTALLATION SHOULD BE CARRIED OUT BY A TRAINED COMPETENT FITTER
INDOOR
OUTDOOR
©
UNITS P1-P3 GROVEMERE COURT BICTON INDUSTRIAL PARK KIMBOLTON CAMBS PE28 OEY TEL: +44 (1480) 861001 FAX: +44 (1480) 861002 E-MAIL: info@shrinkpolymersystems. co. uk WEBSITE: www. shrinkpolymersystems. co. uk
General Fitting Instructions
!!
It is highly recommended that suitable tools are utilised for the correct preparation on Paper Cables Use a propane gas torch with a soft flame Avoid a pencil like blue flame which is caused by unregulated supply Keep the flame on the move to ensure even shrinkage of all the materials and also helps to reduce scorching Ensure that all components are kept clean and grease free during installation Allow to cool before applying any mechanical strain
Remove Outer Cable Sheath:
CONNECTION TYPE STRAIGHT CONNECTION CROSSED CONNECTION LENGTH INDOOR L 650mm LENGTH OUTDOOR L 650mm NOT APPLICABLE X LENGTH OF BARREL + 10%
700mm
Table 1
Alternative tail lengths available upon request. [. . . ] Belted Cable Preparation
Expose the Lead or Aluminium Sheath to a dimension of 250mm from the outer Cable Sheath.
20mm 5mm
BELT PAPERS CARBON PAPERS LEAD OR ALUMINIUM SHEATH
Unwind the Black Carbon Paper and remove to a binder positioned 5mm from the Metal Sheath cut. Using a further binder, remove the Belt Papers to 25mm from the Metal Sheath cut.
BELL THE LEAD SHEATH
Fitting the Clear Shrink Sleeves With a clean dry cloth, carefully remove any Grease from the Cores. Position the Clear Shrink Sleeves over each Core approx 50mm up from the Cable Crutch. With a suitable heat sourse, shrink the end's of the Sleeves for about 50mm, before fully shrinking, rotate the Sleeves and push down into the Crutch. Note: Ensure there are no air voids and the Sleeves are wrinkle free, also note that excessive heat may dry out and damage the Paper Insulation.
CLEAR SHRINK SLEEVES
Fitting the Stress Control Tubes Position the Stress Control Tubes onto the Cores at a distance of 50mm up from the Metal Sheath Cut. Shrink the Tubes one at a time, starting from the bottom working upwards. Ensure that the Tubes are evenly shrunk and aligned.
50mm
STRESS CONTROL TUBE
Cable Crutch Preparation Remove the Grey Mastic Crutch Wedge from its container and insert well down into the Cable Crutch so that any Air gaps are eliminated.
MASTIC CRUTCH WEDGE
With tension, wrap the Grey Mastic Tape around the Crutch area and overlap the Stress Control Tubes and Lead or Aluminium Sheath by approx 10mm. Note:- Ensure that the space between the Bell of the Lead Sheath and the entire area between the Cores is fully covered by the Mastic tape to eliminate Air Voids. With a suitable solvent, clean the Metal Sheath before proceeding.
10mm LEAD OR CAS SHEATH
10mm
3. General Cable Preparation
Installing the Breakout Boot Slide the 3 Leg Semi-Conductive Breakout Boot down the Cores and press firmly down into the Crutch. The Legs of the Boot should be in contact with the Stress Control Tubes and the Skirt should cover the Grey Mastic Tape and make contact with the Lead or Aluminium Sheath. The Boot may need to be held in place during installation.
SEMI-CONDUCTIVE BREAKOUT BOOT
4. Installing Cable Lugs
X
Allowing for dimension X (Lug Barrel + 5mm), cut the Cores to suit the fixing point on the equipment being used. Measure a distance of X (See Table 1) back from the end of each Core and remove Insulation.
L + 200mm
With a suitable tool, install Cable Lugs ensuring that any sharp points are removed. Note:- Where Mechanical Connectors are to be used, user should check that the Core Tubes are able to slide over prior to fitting.
5. Installing Anti-Track Tube
Preheat each Cable Lug and wrap two layers of Red Sealant Tape over the Lug Barrel extending onto the Insulation by approx 10mm. [. . . ] If a termination is to be mounted for connection above the equipment i. e in the reverse position, sheds should be installed 0 through 180 as shown.
7. Core Crossing
Screened Cable If the Cores on a Paper Screened Cable have to be crossed, ensure that the cross takes place within the screened area below the Stress Control Tubes.
STRESS CONTROL TUBES FITTED IN A HIGHER POSITION
Belted Cable Core crossing on Belted construction is not recommended unless the minimum clearances are achieved (See Table 2). Note:- Core Crossing/Improved Clearance kits utilising Heatshrink Conductive Tubings can be supplied if requested. [. . . ]