User manual RAVENHEAT CSI 85T

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual RAVENHEAT CSI 85T. We hope that this RAVENHEAT CSI 85T user guide will be useful to you.


RAVENHEAT CSI 85T : Download the complete user guide (5197 Ko)

Manual abstract: user guide RAVENHEAT CSI 85T

Detailed instructions for use are in the User's Guide.

[. . . ] CONDENSING SYSTEM INNOVATION AUTOMATIC MODULATING BOILER FOR CENTRAL HEATING AND DOMESTIC HOT WATER This new super high efficient turbo-modulating boiler is designed to meet domestic hot water and central heating requirements at super high efficiency, unheard of only a few years ago. POSITION The appliance is extremely versatile as it can be fitted in almost any room. The appliance is room sealed, there is no contact between combustion chamber and living accommodation. Indeed, our depression/combustion front cover has been designed to fit, achieving maximum air tight seal using screw down fasteners at 15 cm. [. . . ] 5. 6. 1) Fitting valve pack Remove plastic caps from boiler connection and fit flanged copper tail and valves as per Fig. 46) A minimum working gas pressure of 20 mbar (8 in w. g. ) must be available at the boiler inlet at full flow rate (37 mbar for propane, 29 mbar for butane). Fit gas service cock to the boiler via the union nut and connect gas pipe. Do not overtighten and use another spanner as a counter force to avoid straining internal connections. 46) 5. 10. 1 Before any central heating connections are made to the boiler all system valves should be opened and the system thoroughly flushed out with cold water. - Connect the central heating return pipe to the isolating cock marked CHR. - Connect the central heating flow pipe to the isolating cock marked CHF - Pipe dimensions and positions are marked on template supplied and fig. 45. 5. 9 Cut a 105 mm diameter hole through the ceiling and/or roof, at the point previously marked. Insert the Vertical Flue terminal assembly through the flashing plate from the outside Fix the appliance to the wall, locating onto the top coach bolts. NOTE: Where this length does not match any standard combination of the extensions, extension can be cut to the required length (Fig. When cutting both inner and outer ducts of the extension, always cut on spigot side, and they must be de-burred. 5. 9. 1 5. 9. 2 5. 10 24 5. 11 5. 11. 1 DOMESTIC HOT WATER (Fig. 46) The domestic hot water circuit does not need a safety valve but it is essential to ensure that the pressure of the cold water supply does not exceed 10 bar. If in doubt it is advisable to install a pressure reducing valve The minimum pressure needed to operate the domestic hot water system is 0 5 bar with a flow of approx 3 Us per min. The regulator screw on the cold water outlet of the diverter valve may be adjusted to prevent excess volume flow (Fig. 53 COMMISSIONING SECTION) Flush out all foreign matter from the supply pipe before connecting to the appliance. It has a threaded outlet RC 1/2" (to 15 mm copper) to permit a discharge pipe to be connected. The discharge should terminate facing downward exterior to the building in a position where discharging (possibly boiling water & steam) will not create danger or nuisance, in easily visible position, and not to cause damage to electrical components or wiring. The discharge must not be over an entrance or a window or any other type of access ELECTRICAL CONNECTIONS IMPORTANT: Electricity supply must be as specified in clause (sect. 4 10) - When controls external to the appliance are required, design of the external electrical circuits should be undertaken by a competent person. Factory fitted internal wiring must not be disturbed when wiring external controls 5. 12 5. 12. 1 5. 13 5. 13. 1 - To gain access to the electrical box remove the front panel of the case as described in clauses (sect. - The terminals are easily visible on the front of the electronic control board (Fig. [. . . ] This Log Book is to be completed in full by the competent person(s) who commissioned the boiler and associated equipment and then handed to the customer. When this is done, the Log Book is a commissioning certificate that can be accepted as evidence of compliance with the appropriate Building Regulations. Failure to install and commission this appliance to the manufacturer's instructions may invalidate the warranty. The above does not affect your statutory rights. INSTALLER & COMMISSIONING ENGINEER DETAILS INSTALLER DETAILS COMPANY NAME ADRESS INSTALLER'S NAME INSTALLER DATE TEL No. CORGI REGISTRATION DETAILS REG No. CORGI ID SERIAL No. COMMISSIONING ENGINEER NAME ADRESS (IF DIFFERENT) COMMISSIONING DATE TEL No. CORGI REGISTRATION DETAILS REG No. CORGI ID SERIAL No. APPLIANCE & CONTROL DETAILS BOILER MAKE AND MODEL APPLIANCE SERIAL No. OR REPLACEMENT BOILER %% CONTROLS To comply with the Building Regulations, each section must have a tick in one or other of the boxes. REQUIREMENT 1. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE RAVENHEAT CSI 85T




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual RAVENHEAT CSI 85T will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.