User manual OMRON NSA12-15-TX11B

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual OMRON NSA12-15-TX11B. We hope that this OMRON NSA12-15-TX11B user guide will be useful to you.


OMRON NSA12-15-TX11B : Download the complete user guide (6579 Ko)

Manual abstract: user guide OMRON NSA12-15-TX11B

Detailed instructions for use are in the User's Guide.

[. . . ] V238-E1-02 NSA-Series NSA-Series Industrial PC USER´S MANUAL NSA-Series Industrial PC NSA12/15-TX11B NSA12/15-TX11S NSA12/15-TX12B NSA12/15-TX12S User's Manual iv Introduction The NSA-series Industrial PC is an industrial, panel-mountable computer equipped with a Celeron M Processor and featuring a touch panel and display. Be sure to read and understand the functions and performance specifications in this manual prior to using it, and operate it as described herein. Intended Audience This manual is intended for the following personnel, who must also have knowledge of electrical systems (an electrical engineer or the equivalent). · Personnel in charge of introducing FA systems into production facilities · Personnel in charge of designing FA systems · Personnel in charge of managing FA systems and facilities Notice This manual provides information for connecting and setting up an NSA-series Industrial PC. Be sure to read this manual before attempting to use it, and keep the manual close at hand for reference during operation. OMRON, 2008 All rights reserved. [. . . ] Be sure the screws are properly tightened. Prepare the connection wires as shown in the figure below. Make sure the bare wires are twisted tightly together. 3-4-4 Connecting the Grounding Wire The NSA-series Industrial PC has a functional grounding terminal ( ). Make sure the terminal is properly grounded to prevent the Unit from malfunctioning due to electrical noise. Functional grounding terminal Attach a crimp terminal for an M4 screw to the grounding wire. 3-15 3-4 Installing the NSA-series Industrial PC 8 mm max. Note · · 3 Installing the NSA-series Industrial PC and Connecting Peripheral Devices Do not install the NSA-series Industrial PC in the same panel as a noisegenerating device like a motor or inverter. Make sure the NSA-series Industrial PC is properly grounded to prevent the Unit from malfunctioning due to electrical noise. 3-16 3-5 Starting the Industrial PC and Procedure after Power Interruption 3-5-1 Operation 3-5 Starting the Industrial PC and Procedure after Power Interruption Make sure that the power supply connected to the NSA-series Industrial PC satisfies the following specifications for NSA-series Industrial PC startup and power interruption. 3-5-1 Operation Starting the Operating System If the external 24 V DC input voltage is turned OFF, the NSA-series Industrial PC operating system will start up when the rated input voltage is supplied to the NSAseries Industrial PC. The input voltage must remain OFF for at least 10 s before it is turned back ON. (OFF/ON interval: 10 s min. ) 3 Installing the NSA-series Industrial PC and Connecting Peripheral Devices Shutting Down the Operating System The NSA-series Industrial PC shuts down the operating system when it receives a shutdown request from a software application, or when the user executes a shutdown operation. When the shutdown is completed, the NSA-series Industrial PC will turn OFF all DC outputs except the 5-Vs auxiliary power supply. Power Interruptions If the 24 V DC input voltage from the external power supply is interrupted, all NSA-series Industrial PC power supplies, including the 5-Vs auxiliary power supply, will turn OFF. If this occurs during any operation, including shutdown, that operation may not be successfully completed. Be sure to turn OFF the external 24 V DC input voltage after the shut down is completed. The NSA-series Industrial PC does not have UPS or other recovery functions for power outages or power interruptions. These functions will have to be provided externally (on the system side). Note Confirm the safety of the system before turning the power ON or OFF. 3-17 3-5 Starting the Industrial PC and Procedure after Power Interruption 3-5-2 Operating Sequence for the External Power Supply 3-5-2 Operating Sequence for the External Power Supply The following diagram shows the power supply control sequence under normal operating conditions. External input Do not turn OFF the input voltage while the NSA is operating. Input voltage held OFF for at least 10 s. 10 s min. 3 Installing the NSA-series Industrial PC and Connecting Peripheral Devices NSA built-in power supply (excluding the 5-Vs auxiliary power supply) OS shutdown begins NSA NSA operating NSA starts up NSA starts up OS shutdown ends Note · · · · If the external input voltage is interrupted, it must remain OFF for at least 10 s before it is turned back ON. (OFF/ON interval: 10 s min. ) If the external input voltage is interrupted during any operation, including shutdown, that operation may not be successfully completed. Shut down the NSA-series Industrial PC and turn OFF the external 24 V DC input voltage. The NSA-series Industrial PC does not have UPS or other recovery functions for power outages or power interruptions. These functions will have to be provided externally (on the system side). Make sure that the power supply connected to the NSA-series Industrial PC satisfies the following specifications for NSA-series Industrial PC startup and power outages. The entire system may shut down depending on how the power is turned ON or OFF. Follow the correct procedure for turning the power ON and OFF. 3-18 3-6 Adjusting the Touch Panel and Display 3-6-1 Calibrating the Touch Panel 3-6 Adjusting the Touch Panel and Display 3-6-1 Calibrating the Touch Panel This section describes the procedure for calibrating the touch panel. Calibrate the touch panel whenever it deviates markedly from its coordinate. Connect a USB keyboard and mouse to the NSA-series Industrial PC before calibrating the touch panel. Start up the NSA-series Industrial PC and select Start ­ Programs ­ UPDD ­ Settings from the bottom left corner of the screen to launch the settings program. 3 Installing the NSA-series Industrial PC and Connecting Peripheral Devices Settings 3. Click the Calibration Tab on the Pointer Device Properties Menu, then click the Calibrate Button. Calibrate Button Make sure the EEPROM Calibration box is selected. 3-19 3-6 Adjusting the Touch Panel and Display 3-6-1 Calibrating the Touch Panel 4. [. . . ] Some application programs that operate on the Windows XP Professional OS may not operate on the Windows XP Embedded OS of an NSA-series Industrial PC. In addition, the Windows components cannot be added and deleted by selecting Add or Remove Programs from the Control Panel. Appendix Appendix Appendix-25 Appendix 4 Connecting an NE1S-Series CPU Unit Appendix 4 Connecting an NE1S-Series CPU Unit Two serial ports cannot be used at the same time if the NE Programmer is installed in the NSA-series Industrial PC and an NE1S-Series CPU Unit is connected using the USB port. Start the NSA-series Industrial PC and open the Control Panel from the Start Button at the bottom left of the screen. Click the Hardware Tab in the displayed System Properties Dialog Box, and click the Device Manager Button. Appendix-26 Appendix 4 Connecting an NE1S-Series CPU Unit 3. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE OMRON NSA12-15-TX11B




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual OMRON NSA12-15-TX11B will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.