User manual LIFT-MASTER SURGE SUPPRESSOR

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual LIFT-MASTER SURGE SUPPRESSOR. We hope that this LIFT-MASTER SURGE SUPPRESSOR user guide will be useful to you.


LIFT-MASTER SURGE SUPPRESSOR : Download the complete user guide (2086 Ko)

Manual abstract: user guide LIFT-MASTER SURGE SUPPRESSOR

Detailed instructions for use are in the User's Guide.

[. . . ] Miracle - OneTM surge suppression installation manual Please read this entire manual before installation Safe Possible Damage 50 ft 50 ft Properly grounded Miracle-OneTM Properly grounded Miracle-OneTM Inputs protected by the Surge Protection Module. [. . . ] The earth ground rod must be located within 3 feet from the gate operator. Use the proper type earth ground rod for your area. Before digging more than 18" deep, contact local underground utility locating companies 12 gauge wire Avoid damaging gas, power, or other underground utility lines. 8 Ft The ground wire must be a single, whole piece of wire. If you should cut the ground wire too short, break it, or destroy its integrity, replace it with a single wire length. Not responsible for improper installation or failure to comply with all necessary local building codes. ® © 2004 The Chamberlain Group, Inc. All Rights Reserved TM 845 Larch Avenue Elmhurst, Illinois 60126 www. chamberlain. com Additional Protection Against Surges for Gate Operators For additional protection against surges, ensure that the cables or wires going to your accessories comply with the following rules: All wires going the the accessories must be shielded wires. The shield must be connected as follows: A) At the gate operator: To the chassis of the gate operator B) At the accessories: To their chassis (Earth grounding at the accessories will be even more beneficial) Ensure that the connections to the chassis are made as tight as possible to create good contact. For Technical Support: 1-800-528-2806 ® 01-50741 © 2004 The Chamberlain Group, Inc. All Rights Reserved TM 845 Larch Avenue Elmhurst, Illinois 60126 www. chamberlain. com ® Miracle-OneTM Surge Protection Board STEP 1 STEP 2 Step-by-Step Installation instructions TM STEP 3 STEP 4 1 3 2 Unplug transformer. 1 Disconnect the battery cable plug first 3 Unplug J1 plug last. 2 Unplug J3 plug second Remove the control board with 3 screws. Remove the plastic battery rack with 4 nuts. STEP 5 STEP 6 STEP 7 STEP 8 Remove the batteries from old rack and reinstall them into the new rack. Place the new battery rack in the control box and secure with the 4 nuts. Install the surge suppressor board in position shown with 3 screws supplied. Reinstall the control board in the same screw-hole positions. [. . . ] Connect the J1 and J3 plugs from the surge suppressor board to the control board. STEP 9 STEP 10 STEP 11 STEP 12 Earth Ground Rod Rewire the old J1 and J3 plug wires to the surge suppressor terminals. Plug transformer back in. Reconnect the battery cable plug. The green ground wire MUST be properly connected to an earth ground rod! [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE LIFT-MASTER SURGE SUPPRESSOR




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual LIFT-MASTER SURGE SUPPRESSOR will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.