User manual GTO PRO-SL 50006000

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual GTO PRO-SL 50006000. We hope that this GTO PRO-SL 50006000 user guide will be useful to you.


GTO PRO-SL 50006000 : Download the complete user guide (654 Ko)

Manual abstract: user guide GTO PRO-SL 50006000

Detailed instructions for use are in the User's Guide.

[. . . ] INSTALLATION INSTRUCTIONS FOR GTO/PRO SL-5000 and GTO/PRO SL-6000 AC Powered Slide Gate Operators LI US STED WARNING! · READ ALL INSTRUCTIONS COMPLETELY before attempting installation and use; failure to do so may result in serious injury or death!· This unit must only be installed by an experienced technician!Contact with gate operator circuitry can cause serious injury or death!Stay clear of the unit while it is operating and exercise caution at all times. This product meets and exceeds the requirements of UL 325, the standard which regulates gate operator safety, as established and made effective March 1, 2000, by Underwriters Laboratories Inc. DO NOT Install This Operator Without Roller Guards And Safety Edges! © 2000 GTO, Inc. [. . . ] You must use (4) 1/2" diameter mounting anchors, washers, and nuts (not included) to mount the operator on the pad. Lay the mounting template on the level concrete pad and mark the pad according to the instructions on the template. Before mounting the operator, check the following: · · · The concrete pad is level. Four (4) 1/2" diameter mounting anchors are in their correct positions. Conduit for power and accessory wiring is installed. Installation Alignment Driveway Fence Post C L Safety Edges (REQUIRED) Gate 4" to 6" (REQUIRED) Safety Edge Fence Post Roller Safety Edge (REQUIRED) Chain Bracket Chain brackets must be installed (welded or bolted) to provide 4 to 6 inches between chain and inside of gate. This will insure adequate clearance between the operator housing and the gate. Roller Operator must be mounted with the chain rollers and sprocket aligned with the chain. Pad mounting holes line up with chain idler wheels and should be no closer than 4 inches and no futher than 6 inches from the gate. 7" center to center mounting holes 1811/16" center to center mounting holes Use 1/2" dia. concrete mounting bolts in mounting pad. 10 Removing the Operator Housing Before you can gain access to the operator frame and its mounting holes, the housing will have to be removed from the operator. Remove the (2) 3/8" chrome acorn nuts and (2) 3/8" washers from the operator housing (this hardware is located on the front of the housing). Lift the housing off the operator and set it aside. Acorn nuts Washers Mounting the Operator 1. Lift the operator and align its mounting holes over the 1/2" diameter concrete mounting anchors. Lower the operator into position and fasten it to the mounting anchors with (4) 1/2" washers and nuts (not provided). Step down on the foot pedal to disengage chain sprocket (see GTO FOOT PEDAL RELEASE on page 1). Bolt or weld (when correct position is determined) the chain brackets (included) on the operator side of the gate (see illustration on next page). Secure chain adjuster bolt using the (2) 1/2" nuts (included), one on each side of the bracket. Do not overtighten the nuts; they will be used to adjust chain tension. Use #40 chain with the GTO/PRO SL-5000, and #50 chain with the GTO/PRO SL-6000. Thread chain through chain sprockets (foot pedal release should already be activated). 2. 2. 3. 11 4. Chain adjuster bolts: adjust outside nut until desired chain tension is achieved. Release foot pedal to re-engage chain sprocket. 5. Chain Bracket Sprocket Chain Bracket Roller Guides ! WARNING · Fingers, hands, and loose clothing may be dragged into chain sprockets. · Keep hands, fingers, and loose clothing away from chain and sprockets. Chain slack (1" for every 10' of chain) Gate Chain Bracket and Adjustment Bolt (included) Chain (included) Master Link (included) Connecting Power to the Operator Have a licensed electrician run 115 Vac wiring into a Field Wiring Connection Compartment (ON/OFF) box. The circuit must be protected with a 15 A main disconnect breaker (not provided). NOTE: Power and wiring connections MUST be installed by a licensed electrician in accordance with NEC (National Electric Code) and local codes. [. . . ] The warranty period for residential installations is five (5) years for mechanical parts; three (3) years for electronic components. The warranty period for commercial installations is three (3) years for mechanical parts; two (2) years for electronic components. In the case of product failure due to defective material or manufacturer workmanship within the warranty period, the operator will be repaired or replaced (at manufacturer's option) at no charge to the customer, if returned freight prepaid to GTO, Inc. , 3121 Hartsfield Road, Tallahassee, Florida 32303. IMPORTANT: Call (850) 575-0176 or Fax (850) 5758950 for a Return Goods Authorization (RGA) number before returning to factory. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE GTO PRO-SL 50006000




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual GTO PRO-SL 50006000 will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.