User manual FIELD CONTROLS 46294900
DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!
If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual FIELD CONTROLS 46294900. We hope that this FIELD CONTROLS 46294900 user guide will be useful to you.
Manual abstract: user guide FIELD CONTROLS 46294900
Detailed instructions for use are in the User's Guide.
[. . . ] CONTROL KIT
Model: CK-65
Timer P/N 46144700
Aluminum Tubing Relay P/N 46126600
WMO-1 Safety Kit P/N 46086901
Designed for controlling oil fired heating appliances using a Honeywell R8184G or equivalent Primary Control. ITEMS INCLUDED IN KIT: 1 - Junction box with mounted pressure switch and and solid state post purge control 1 - WMO-1 Secondary Safety Switch 1 - Delay oil solenoid valve with preset pre-purge 1 - 2 ft. length of 1/4 inch aluminum tubing 2 - Flexible conduit connector 1 - 1/4 inch tubing connector
2630 Airport Road · Kinston, NC 28504 Phone: 252-522-3031 · FAX: 252-522-0214 www. fieldcontrols. com
INSTALLATION AND ADJUSTMENTS MOUNTING JUNCTION BOX: The junction box can be mounted at the venter or remotely mounted away from the venter. [. . . ] Attach the 1/4 inch tubing connector to the pressure tube on the SWG Venter. Connect the supplied 1/4" aluminum tubing to the tubing connector. Route the tubing to the CK-65 junction box and connect the tubing to the pressure switch. When routing the tubing, avoid kinking the tubing by bending the tubing too sharply. For remote mounted CK-65 Junction Box, use a 1/4" OD copper, aluminum or plastic tubing and route the tubing to avoid contact with any heat source. PROVING SWITCH ADJUSTMENTS: After proper air flow is established, the pressure switch adjustment is made by turning the pressure switch adjustment screw clockwise (See Fig. Turn the adjustment screw an additional 1/4 to 3/4 turn counterclockwise to ensure adequate switch adjustment. WARNING: Failure to properly adjust the pressure switch as specified above could lead to improper operation of the pressure switch which will result in a hazardous condition and bodily harm!POST PURGE TIMING ADJUSTMENT: To adjust the post purge time, rotate the timer adjustment on the timer counterclockwise to increase the operation time. To decrease the operation time, rotate the timer adjustment clockwise. WIRING INSTRUCTIONS CAUTION: DISCONNECT ELECTRICAL POWER WHEN WIRING POWER VENTER Wire the venter motor and controls in accordance with the National Electrical Code, manufacturer's recommendations and/or applicable local codes. Check ground circuit to make certain that the unit has been properly grounded. The wiring should be protected by an over current circuit device rated at 15 amperes. CAUTION must be taken to ensure that the wiring does not come into contact with any heat source. [. . . ] Main burner does not fire when thermostat calls for heat with venter operating. Check pressure switch for continuity across terminals, during venter operation 2. Check for negative pressure in building.
Page 5
DO NOT DESTROY
THESE INSTRUCTIONS MUST REMAIN WITH EQUIPMENT Installation Information
Model No. : ___________________________________ Installer's Name: ______________________________ Installer's Company:____________________________ Phone No. : ___________________________________ Date of Installation: ____________________________
Page 6
Page 7
Page 8
P/N 46294900 Rev A 05/00 [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE FIELD CONTROLS 46294900
Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual FIELD CONTROLS 46294900 will begin.