User manual DELONGHI PINGUINO PAC210

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual DELONGHI PINGUINO PAC210. We hope that this DELONGHI PINGUINO PAC210 user guide will be useful to you.


DELONGHI PINGUINO PAC210 : Download the complete user guide (555 Ko)

Manual abstract: user guide DELONGHI PINGUINO PAC210

Detailed instructions for use are in the User's Guide.

[. . . ] - Wait at least 3 minutes before restarting, after the air-conditioner has been switched off or the thermostat setting changed. - Before moving the air-conditioner, empty water from collecting tray (see instructions for drainage at page 13). - Important: If you need to use an extension cord, please be sure to use a heavy duty extension cord (minimum 14 gauge). SAVE THESE INSTRUCTIONS 2 Dear user, We thank you for purchasing the Pinguino air-conditioner and congratulate you on your wise choice. For optimal results please read this manual carefully before installing or operating. [. . . ] 1 cm is enough). 7 3"1/2 ;; ;; TEMPORARY INSTALLATION Note: In both cases (permanent and temporary installations) make sure that the Pinguino is positioned on level ground. If necessary use the two caster stops for the front casters This installation makes it easy to use Pinguino in any room, provided there is a window or a door: it allows you to use the Pinguino immediately. If you have a sash window, place the bracket on the window sill, extend the bracket fully within the window frame and lower the window onto the bracket. Insert the nozzle of the exhaust hose into the slot, then connect the hose to the air conditioner (fig. 7). Thanks to the wing nut, it's possible to use the window bracket also for sliding windows. Position the hole of the bracket so to allow a correct installation of the exhaust hose (see the following instructions). window bracket 30 cm fig. 7 SET UP INSTRUCTION For permanent installation place the Pinguino near the outlet opening in wall or window (where it is meant to be used). The diagram below shows the correct way to install the exhaust hose. 1) Water collects at this point 2) Bend this section 3) Bend this section fig. 8 NO YES YES 8 ELECTRICAL CONNECTION Check that the power supply voltage is 115 V ~ 60 Hz. Important: if you need to use and extension cord, please be sure to use a heavy duty extension cord (minimum 14 gauge). Before connecting the Pinguino to power supply, make sure that all switches on the front control panel are in the OFF position. Connect power cord found in storage compartment at rear of the Pinguino. fig. 9 FINAL CHECK In order to obtain the maximum performance from your air-conditioner make sure that: fig. 10 - Doors and windows of room to be airconditioned are closed (with the exception of temporary installation where a partially opened window is necessary). 13 - Shade the room as far as possible from direct sunlight by drawing curtains and/or lowering blinds or shutters, for economical and efficient air-cooling. - Ensure that intake and outlet vents (fig. Make sure there are no sources of heat in the room. 9 DESCRIPTION OF PINGUINO PAC 210 U CONTROLS ON/OFF button ON/OFF pilot light A B C "Alarm" pilot light Timer ON/OFF pilot light Timer notches Thermostat Timer ON/OFF button Selecting fan speed button SETTING THE TIMER The programmer/timer, like all clocks, must be set to the exact time. If for example it is 4. 00 p. m. , turn the dial in a clockwise direction (following the direction of the arrow) until the number 4 is lined up with the arrow pointer (the arrows indicates 4:00 p. m. 2) Set the operating times by pushing out the notches on the dial corresponding to the period required (each notch represents 15 mins. ). 3) Check that the timer indicates the correct time (see instructions on setting). Funzionamento Operating time 11 10 9 eg. from 9 to 11 a. m. 11 arrow pointer Note:Never turn the dial in an anti-clockwise direction!The timer is in effect, an electric clock and works only if the plug is connected to the power supply. Whenever the plug is disconnected or there is a power failure, the programmer stops (the clock is then "slow") and must be re-set. [. . . ] 17 CONTROLS AT THE BEGINNING OF THE SEASON Carefully follow installation procedure. Check for any defects in power cord and plug. fig. 18 12 AIR FILTER CLEANING Maintenance of air filter A clogged air filter reduces the quantity of circulating air and the efficiency of the appliance. 20 Remove dust with a vacuum cleaner Rinse with running water fig. 21 Cleaning procedure To remove dust deposited on filter, use a vacuum cleaner. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE DELONGHI PINGUINO PAC210




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual DELONGHI PINGUINO PAC210 will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.