User manual CANON REALIS WX520 PRO AV DRAWING

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual CANON REALIS WX520 PRO AV. We hope that this CANON REALIS WX520 PRO AV user guide will be useful to you.


CANON REALIS WX520 PRO AV DRAWING: Download the complete user guide (1569 Ko)

You may also download the following manuals related to this product:

   CANON REALIS WX520 PRO AV COMMAND LIST (1010 ko)

Manual abstract: user guide CANON REALIS WX520 PRO AVDRAWING

Detailed instructions for use are in the User's Guide.

[. . . ] The Form Specifications are not intended for any specific application or use and project specific considerations must be taken into account in the architect’s or engineer’s preparation of actual system specifications. Canon makes no representation or warranty with respect to these Form Specifications and nothing contained herein shall create, or be inferred to create, any express or implied warranty by Canon. These Form Specifications are intended solely to for the purpose of reflecting general guidelines for video surveillance system specifications, taking into account the features of the Canon model REALIS WX520 PRO AV in production as of the date hereof, as set forth under Sections 2. 02 B through 2. 02 P herein. Canon reserves the right to change the features or specifications of the aforementioned model at any time, without notice. [. . . ] Contractor shall clean up, on a daily basis as the Work progresses, all dirt, dust and debris caused by Contractor’s operations. Clean up shall be completed by the end of each workday to the satisfaction of OWNER’s on-site representative. In the event that Contractor fails to clean up, OWNER may elect to have clean up performed by others, with the costs of such clean-up being charged to the Contractor. Definition: Construction Aids are facilities and equipment required by personnel to facilitate the execution of the Work. Construction Aids include scaffolds, staging, ladders, platforms, hoists, cranes, lifts, trenchers, core drillers, protective equipment, and other such facilities and equipment. Contractor shall provide all Construction Aids required in the execution of the Work. Construction Aids that are the property of OWNER or other contractors shall not be used without permission. Storage of Construction Aids shall be coordinated with OWNER’s on-site representative. The Contractor shall be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the Work. Contractor shall comply with all local, state, and federal regulations and laws for the safety of the work place. Accident Reports Serious or fatal accidents shall be reported immediately by telephone or radio to the OWNER’s Project Manager. 2. 3. 4. 5. B. Existing Conditions Existing Wiring, Conduits, and Raceways 1. Contractor shall correct any deficiencies discovered as the result of the inspection and pre-test. Contractor shall submit a request for the Acceptance Test & Inspection in writing to the OWNER Project Manager, no less than fourteen days prior to the requested test date. The request for Acceptance test shall be accompanied by a certification from Contractor that all Work is complete and has been pre-tested, and that all corrections have been made. During Acceptance Test & Inspection, Contractor shall demonstrate all equipment and system features to OWNER. Contractor shall remove covers, open wiring connections, operate equipment, and perform other reasonable work as requested by OWNER. Any portions of the Work found to be deficient or not in compliance with the Project Drawing and Specifications will be rejected. OWNER Project Manager will prepare a list of any such deficiencies observed during the Acceptance Test & Inspection. Upon correction of deficiencies, Contractor shall submit a request in writing to OWNER Project Manager for another Acceptance Test & Inspection. If, at the conclusion of the Acceptance Test & Inspection, all Work is found to be acceptable and in compliance with the Project Drawings and Specifications, OWNER Project Manager will issue a letter of Acceptance to Contractor and OWNER. B. C. D. E. PART 2 PRODUCTS OWNER / November 22, 2013 28 23 00 - 9 Video Surveillance System Canon model REALIS WX520 PRO AV A&E Specifications 2. 01 GENERAL A. All products not provided by OWNER shall be new and unused, and shall be of manufacturer’s current and standard production. Where two or more equipment items of the same kind are provided, all shall be identical and provided by the same manufacturer. [. . . ] Design, lay-out, size and plan new conduit and raceway systems as required. Route exposed conduit and raceway parallel and perpendicular to walls and adjacent piping. Group conduit in parallel runs where practical and use conduit rack constructed of steel channel with conduit straps or clamps. Use conduit bodies to make sharp changes in direction, as around beams. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE CANON REALIS WX520 PRO AV




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual CANON REALIS WX520 PRO AV will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.