User manual APPLIED ENERGY XIM 200

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual APPLIED ENERGY XIM 200. We hope that this APPLIED ENERGY XIM 200 user guide will be useful to you.


APPLIED ENERGY XIM 200 : Download the complete user guide (1131 Ko)

Manual abstract: user guide APPLIED ENERGY XIM 200

Detailed instructions for use are in the User's Guide.

[. . . ] Close to the unit there must be a 220/240 Volt fused spur (with earth), a suitable connection for the condensate drain and sufficient space to connect the duct runs to the heat recovery unit. If the unit is to be fixed to a wall/partition the unit must be installed using the hanging bracket provided. The wall should b e structurally rated to accept a weight of 200Kg per square meter. The unit must be installed horizontally (with the spigots at the top). [. . . ] The unit must be installed horizontally (with the spigots at the top). Enough space should be left to allow a significant slope for the condensate drain to ensure correct evacuation of the water. A minimum space of 800 mm is needed at the front of the unit to open the access door and change the filters. Connect power supply after assembling the ducting!2. 1 Regulations Where applicable installation of the unit must comply with all local regulations including, building, electrical and sewerage connections. 2. 2 Mounting the unit The Xcell unit can be placed on a floor or attached to a wall with the hanging bracket provided. If floor mounted, assemble the unit so that sound and vibration transfer is avoided and there is sufficient height for the condensation drain. 2. 3 Connect the ducting To avoid condensation ductwork inside the loft space must be insulated. It is recommended that that insulated acoustic flexible ducting be used with a minimum length of 1 metre on the external sides of the unit and a minimum length of 500 mm on the internal side. Where possible the air intake to the building should be sited in a sheltered area. Supply and extract to and from the house can be through roof terminals or louvres. To make sure there is no re-circuiting of polluted air a minimum of 2 metres should be allowed between the supply and discharge terminals. Commissioning the system 3. 1 Setting the air volume The unit is provided with 3-step regulation. The supply and extract fan run independently of each other and are individually programmable. 3. 2 Fan speed adjustment (Figure 1) The extract fan can be adjusted with the 3 red potentiometers that are marked AV and the supply fan by those marked TV. When the speed settings are changed the system must be rebalanced ensuring that the supply and extract air flow are similar. This is to protect the heat exchanger from any possible damage. Standard settings for the Xcell 300 are 100, 150 and 300 m ³/h Standard settings for the Xcell 400 are 100, 200 and 350 m ³/h Figure 2: LED panel A B C D E F G H Power supply Frost protection Extract fan on Supply fan on Bypass open (optional) Pos 1: Set back (holidays etc. ) (1) Pos 2: Standard setting (2) Pos 3: Boost (3) 4. Technical specifications 4. 1 unit specification Figure 3: Dimensions Xcell unit Dimensions (W x d x h) Diameter ducting Weight Temperature efficiency Power supply Fuse in unit Protection class Filter class : 740 x 600 x 540 mm : Ø150/160 mm (Xcell 300) or Ø 180 mm (Xcell 400) : 32 kg : 90% : 230 V 50 Hz :2, 0A :IP20 :G3 4. 1. Performance and electrical data Xcell 400 Qv [m³/h] 400 377 347 337 299 265 230 169 98 Pst[Pa] 147 150 145 100 110 88 50 50 45 U[V] 230 230 230 230 230 230 230 230 230 I [A] 1, 52 1, 42 1, 20 1, 02 0, 88 0, 70 0, 53 0, 38 0, 28 P[W] 241 223 189 155 133 103 75 49 31 cos phi [-] 0, 69 0, 68 0, 68 0, 66 0, 66 0. 64 0, 62 0, 56 0, 48 4. 2. Fan Curves Xcell 400 Electrical data Xcell 300 4. 3 Performance Data 200 251 200 150 150 101 100 45 Qv[m³/h] 303 257 241 262 201 181 103 98 U[ V] 230 230 230 230 230 230 230 230 I [A] 1, 17 1, 15 1, 00 0, 87 0, 69 0, 50 0, 37 0, 28 P[W] cos phi [-] 185 177 153 133 101 71 47 31 0, 69 0, 67 0, 66 0, 66 0, 64 0, 61 0, 55 0, 48 5 Maintenance 5. 1 User maintenance Clean the filters (with a vacuum cleaner) twice a year and the air vent grilles wiped clean every 6 months. The two filters can be taken out by the handgrips . 5. 2 Specialist maintenance The heat exchanger must be removed and cleaned every 3 years. Remove the filters. Reassemble the unit (reverse of dismantling) making sure all components are correctly refitted ensuring there are no air leaks. If the fans are dirty they must be cleaned with a brush and vacuum cleaner. 6. Commissioning Records Type plate: Type Bypass Order number Date Valves Extract Required Measured Measured Measured Set back1 Normal 2 Normal2 Boost 3 Kichen Bathroom Toilet Type valve Setting valve Total: Supply Required Normal Pos2 Living room 1 Living room 2 Living room 3 Bedroom 1 Bedroom 2 Bedroom 3 Total: Measured Measured Measured Type Normal Boost Set back valve Pos2 Pos3 Pos1 Setting valve 7. 1 Guarantee Do's and don'ts · Do read all the instruction leaflet before commencing installation. · Do make sure the mains supply is switched off before attempting to make electrical connections or carry out any maintenance or cleaning Guarantee Customers outside UK ­ see international below. [. . . ] Commissioning Records Type plate: Type Bypass Order number Date Valves Extract Required Measured Measured Measured Set back1 Normal 2 Normal2 Boost 3 Kichen Bathroom Toilet Type valve Setting valve Total: Supply Required Normal Pos2 Living room 1 Living room 2 Living room 3 Bedroom 1 Bedroom 2 Bedroom 3 Total: Measured Measured Measured Type Normal Boost Set back valve Pos2 Pos3 Pos1 Setting valve 7. 1 Guarantee Do's and don'ts · Do read all the instruction leaflet before commencing installation. · Do make sure the mains supply is switched off before attempting to make electrical connections or carry out any maintenance or cleaning Guarantee Customers outside UK ­ see international below. · UK: The fan is guaranteed against defects for 5 years from the date of purchase. · If you have any problems, contact Xpelair's Head Office at the address shown below. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE APPLIED ENERGY XIM 200




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual APPLIED ENERGY XIM 200 will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.